Linear metal bumper – galvanized | fi114,3mm, dimension 800mm x 300mm | To be concreted in.

621,00  brutto

Linear metal bumper – fi 114.3 mm, dimension 800 mm x 300 mm, To be concreted in

A sturdy 800 mm x 300 mm linear bumper designed to protect machinery, wall corners and industrial infrastructure. Construction made of durable steel, coated with zinc . Installation in concrete guarantees stability and long-term protection.

Linear metal bumper fi 114.3 mm – dimension 800 mm x 300 mm (To be concreted in)

The 800 mm x 300 mm steel bumper is a professional protection used in industry and logistics. Its main task is to protect key infrastructure elements from accidental damage, which can be caused by forklifts, delivery trucks or other transport vehicles.

Thanks to its robust construction and weather resistance, it will work well both indoors and in outdoor industrial areas and parking lots.


Key features of the bumper:

Sturdy construction114.3 mm fi steel tube.
Corrosion protection – durable hot-dip galvanizing finish for maximum rust resistance (recommended for outdoor use).
High visibility silver color created by hot-dip galvanizing () , increasing security.
Stable installation – fixing by pouring into concrete , ensuring durability and reliability of installation.
Compact dimensions – 800 mm x 300 mm – effectively protects infrastructure from impacts of vehicles and transport trucks.


📌 Application:

🔹 Warehouses and production halls – effective protection of racks, machinery and industrial equipment.
🔹 Loading ramps – protection of entrances and loading areas from collisions.
🔹 Industrial buildings and facilities – protection of walls, corners and entrances from mechanical damage.
🔹 Parking lots and traffic zones – separating parking spaces, protecting poles, lamp posts and other infrastructure elements.
🔹 Logistics centers – increasing security in heavily used spaces.


📏 Technical specifications of the bumper:

Pipe diameter: fi 114.3 mm
Dimensions: 800 mm x 300 mm
Mounting base: 200 x 200 x 8 mm
Mounting holes: fi 12.5 mm (suitable for expansion anchors)
✔ silver – zinc colors
Protective coating:, hot-dip galvanizing
Mounting method: To be embedded in concrete

Produkty wykonywane są na zamówienie. Standardowy czas realizacji uzależniony jest od rodzaju wykończenia produktu:

  • Dla produktów niewymagających cynkowania ogniowegoczas dostawy do 7 dni roboczych.
  • Dla produktów z cynkowaniem ogniowymczas dostawy do 14 dni roboczych.

Staramy się realizować każde zamówienie jak najszybciej, zachowując najwyższe standardy jakości i precyzji wykonania.