Galvanized, powder-coated yellow wheel guides fi 114.3mm | Left / Right | Length 200cm | Bolted to the ground

2098,00  brutto

Galvanized, powder-coated yellow wheel guides | fi 114.3 mm | Left / Right | Length 200 cm | Bolted to the ground

Durable and visible wheel guides made of j steel pipe fi 114.3 mm, hot-dip galvanized and powder-coated in yellow (RAL 1003). They are perfect for loading ramps and loading docks, facilitating safe and precise vehicle approach.

Wheel guide available in left or right version. Symmetrical mounting on both sides of the overrun zone. Anchor-mounted for stability and impact resistance. Ideal for industrial and logistics applications where safety and repeatable maneuvers are important.

Wheel guide galvanized, powder coated yellow – fi 114.3 mm, length 200 cm (Left / Right, screwed to the ground)

Robust wheel homing device made of steel pipe with a diameter of 114.3 mm, designed for securing ramps, loading docks and maneuvering areas. Thanks to hot-dip galvanization and yellow powder coating (RAL 1003), it provides not only resistance to corrosion, but also very good visibility in all conditions. The product is available in left or right version – at the ordering stage, please indicate the appropriate variant in the order note. Mounting to the ground is done with anchors, which ensures stability and resistance to mechanical impact, even in heavily used loading areas.


Key features of the wheel homing device:

Diameter: fi 114.3 mm – excellent rigidity and durability
Overall length: 200 cm
Finish: hot-dip galvanized + powder-coated RAL 1003
Version: left / right – customer’s choice
Mounting: screwed to the ground – fast and solid


📌 Application:

🔹 Logistics centers and warehouses – vehicle guidance
🔹 Transshipment zones – infrastructure protection
🔹 Overrun ramps and industrial gates
🔹 Areas with intensive vehicle traffic


📏 Technical specifications:

Type: wheel guide
Tube diameter: fi 114.3 mm
Length: 200 cm
Material: hot-dip galvanized structural steel
Coating: powder-coated RAL 1003 (yellow)
Variant: left or right
Mounting: bolted to floor
Application: outdoor / industrial

Produkty wykonywane są na zamówienie. Standardowy czas realizacji uzależniony jest od rodzaju wykończenia produktu:

  • Dla produktów niewymagających cynkowania ogniowegoczas dostawy do 7 dni roboczych.
  • Dla produktów z cynkowaniem ogniowymczas dostawy do 14 dni roboczych.

Staramy się realizować każde zamówienie jak najszybciej, zachowując najwyższe standardy jakości i precyzji wykonania.